CABLING & SOLAR WORKS FOR VARIOUS PROJECTS

  • Solar Work – Chembong, Batu Kawan (50MWac, 30MWac, 20MWac)
  • 18.55MWac Solar Work – Kemaman, Terengganu
  • Solar System Installation - Kulim
  • SOLAR Panel Cable termination- FIRST SOLAR, Kulim
  • 185mm2 Relocation Cable & Cable Joint Work- Nagasari Bridge
  • Wiring system for Gas Bottling Plant- Petronas Kerteh, Prai, Bintulu & Port Klang
  • MRT PROJECT, Electrical Installation- VSL- Cheras to Sg. Buluh
  • 11KV New Switchgear Installation
  • 11KV Upgrade Switchgear Installation- Nissan Tan Chong
  • New Sub Main Installation – MAS KLIA Kargo
  • 11 KV New BIOGAS Project - Rompin
  • PTP Johor Port – Repairing Teflon Roofing
  • Genset Servicing and Test Run

CIDB Accreditation
CIDB Accreditation

G3 Contractor

Suruhanjaya Tenaga
Suruhanjaya Tenaga

ST (PIP) N / 28527P / 09405

ISO 9001:2015
ISO 9001:2015

Quality Management System Standard