CABLING & SOLAR WORKS FOR VARIOUS PROJECTS
- Solar Work – Chembong, Batu Kawan (50MWac, 30MWac, 20MWac)
- 18.55MWac Solar Work – Kemaman, Terengganu
- Solar System Installation - Kulim
- SOLAR Panel Cable termination- FIRST SOLAR, Kulim
- 185mm2 Relocation Cable & Cable Joint Work- Nagasari Bridge
- Wiring system for Gas Bottling Plant- Petronas Kerteh, Prai, Bintulu & Port Klang
- MRT PROJECT, Electrical Installation- VSL- Cheras to Sg. Buluh
- 11KV New Switchgear Installation
- 11KV Upgrade Switchgear Installation- Nissan Tan Chong
- New Sub Main Installation – MAS KLIA Kargo
- 11 KV New BIOGAS Project - Rompin
- PTP Johor Port – Repairing Teflon Roofing
- Genset Servicing and Test Run